Water Street North
Mixed Use Condo Project
Water Street North Mixed Use Condo Project APPROVED with a 3-0 SPARC
vote). The Design Team lead by The Fifth Resource Inc, obtained
Petaluma SPARC approval for the 107 unit Mixed Use Project north of Washington
Street East on the west side of the Petaluma River. Improvements will include
Water Street North from Washington through the project, an adjoining Riverwalk
and relocation of the rail to be able to support future trolley traffic.